Slab pre-pour inspection in Sunbury

Before the concrete truck arrives, the steel, pods and beam sizes on your Sunbury slab are checked against the engineer's design.

  • The day before concrete, with steel and pods exposed
  • About 1 hour on site
  • Report within 24 hours
Request a quoteTell us the job and we will call you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage2 of 7
When to bookThe day before concrete, with steel and pods exposed
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, NCC Part 3.2, the engineer's slab design and the soil report

What is included in a Sunbury slab pre-pour inspection

  • Slab class and layout checked against the engineer's design and the soil report
  • Edge beam and internal beam depths and widths
  • Reinforcement size, spacing, laps and trench mesh
  • Bar chairs, cover and support so steel does not sit on the ground
  • Waffle pods, void formers and pod spacing
  • Vapour barrier coverage, laps and tape at penetrations
  • Plumbing and electrical penetrations and sleeves
  • Set-downs for wet areas, garage, porch and alfresco
  • Termite management components installed before the pour
  • Formwork alignment, level and set-out against the plans
  • Stormwater pipe cover and pit positions where visible
  • Site cut, fill and pier holes where visible
  • Hot water service and meter box slab extensions formed
  • Trench cleanliness and debris before the pour
Why it matters here

Slab pre-pour inspections on Sunbury builds

Our Sunbury slab jobs have shown internal beams formed less than half their required width, pods sitting loose inside beams, mesh resting on service pipes and vapour barrier laid over the steel. Each one is cheap to fix today and impossible to fix tomorrow.

What we find at this stage in Sunbury

  • Internal beam formed about 50mm wide against 110mm on the plans
  • Waffle pods loose and drifting into beams
  • Mesh touching service pipes
  • Vapour barrier lying on top of the steel
  • Too few bar chairs to hold cover
  • Shower recess not formed
Waffle pods left unfixed, free to drift and squeeze the beams narrower, found during a slab pre-pour inspection in Sunbury
Waffle pods left unfixed, free to drift and squeeze the beams narrower
More bar chairs needed so the mesh keeps its cover inside the concrete, found during a slab pre-pour inspection in Sunbury
More bar chairs needed so the mesh keeps its cover inside the concrete
Steel sitting too close to the edge to get the concrete cover it needs, found during a slab pre-pour inspection in Sunbury
Steel sitting too close to the edge to get the concrete cover it needs
Sample findings

Sample defects found during our slab pre-pour inspections in Sunbury

Annotated findings from Slab pre-pour inspections.

A loose waffle pod sitting inside an internal beam and blocking the concrete, found during a slab pre-pour inspection in Sunbury
A loose waffle pod sitting inside an internal beam and blocking the concrete
Slab mesh resting against service pipes where a 25mm gap is required, found during a slab pre-pour inspection in Sunbury
Slab mesh resting against service pipes where a 25mm gap is required
Vapour barrier draped over the reinforcement instead of lying beneath it, found during a slab pre-pour inspection in Sunbury
Vapour barrier draped over the reinforcement instead of lying beneath it
Beam width wandering along its run where pods had shifted out of line, found during a slab pre-pour inspection in Sunbury
Beam width wandering along its run where pods had shifted out of line

The other stages of a Sunbury build

  1. Bored piers inspection in Sunbury1Bored piersOnce piers are bored and cages placed, before concrete
  2. Frame inspection in Sunbury3FrameWith frame and trusses up and the roof on, before wrap and cladding
  3. Lock-up (pre-plaster) inspection in Sunbury4Lock-up (pre-plaster)Roof, windows and outside doors in, before plasterboard
  4. Fixing inspection in Sunbury5FixingDoors, joinery and mouldings fitted, before painting
  5. Waterproofing inspection in Sunbury6WaterproofingMembrane on and cured, before the tiler starts
  6. Pre-handover (PCI) inspection in Sunbury7Pre-handover (PCI)Around a week before the handover date

All construction stage inspections in Sunbury →

Guides

Construction stage guides for Sunbury

All guides →

Book a slab pre-pour inspection in Sunbury

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Slab pre-pour inspections in Sunbury: common questions

What is the most serious slab finding you see in Sunbury?

Undersized beams. One Sunbury slab had an internal beam formed at about 50mm where the plans called for 110mm, because pods had moved.

Why do loose pods matter?

A pod that drifts narrows the beam beside it. The beam then carries less load than designed, and nobody can see it once concrete is in.

Does the vapour barrier really matter?

Yes. It stops ground moisture rising through the slab, and it must sit under the steel and be lapped and taped, not draped over the top.

Will the pour be delayed?

Only if something needs fixing first. Most items are corrected by the concreter the same day.

Which standards apply?

AS 2870 for residential slabs and footings, the engineer's design and the soil report for your lot.

Do you need the soil report?

It helps. The engineering is designed around it, and the slab class it gives decides beam depths and steel.